应用改进工程估算法计算涡扇运输机研制费[1]
王礼沅 张恒喜 李寿安
(空军工程大学 工程学院飞机与发动机工程系,陕西 西安,710038)
【摘要】:本文引用国外的工程估算模型对涡扇运输机的研制费用进行估算,再根据等工程费用比进行修正,得到符合我国实际情况的研制费用。该估算结果较为准确,对我国涡扇运输机的研制的开支预算提供了较为可靠的依据。
关键词 工程估算 涡扇运输机 研制费 等工程费用比
中图分类号 F416.5 文献标识码 A
The Development Cost Estimate of a Turbofan Transporter
WANG Li-yuan, ZHANG Heng-xi ,LI Shou-an
(Dept. fo Aircraft and Engineering of Engineering Institute, AFEU, Xi’an 710038, China)
Abstract:The development cost of a turbofan transporter is estimated with a foreign engineering cost method, and the actual development cost is obtained from the modification of the development cost calculated with the method by the cost rate of the analogical project. The result is accurate comparatively, and provides a dependable warrant for the budget of the development of a turbofan transporter.
Key Words: Engineering Cost Method;Turbofan Transporter;Development Cost;
The Cost Rate of The Analogical Project
作者简介:王礼沅(1980-)男,汉族,湖南醴陵人,硕士研究生,主要研究领域为飞机寿命周期费用估算和作战效能评估。地址:空军工程大学工程学院11队,电话:13679213679(手机),029-83687482(办公室),E-mail: Wangly1223@eyou.com.
|